3 Contiguous NYSDEC Inactive Hazardous Waste Sites

Posted by J. Heaney

Walden conducted subsurface investigations and designed, installed, operated and maintained a remedial system to mitigate chlorinated solvent contamination resulting from historic on-site industrial operations at 3 contiguous industrial park properties.

RCRA Closure, Freeport, NY

Posted by J. Heaney

W alden developed and executed a RCRA Closure Plan for a former manufacturing facility and satisfied the NYSDEC requirements for RCRA closure.

Greenfield Cemetery, PBS

Posted by J. Heaney

Planned and implemented a detailed soil gas/groundwater geoprobe investigation
an on-site laboratory to bound an off-site BTEX plume extending approximately one-half mile from the site: Designed and installed an eight well… off-site groundwater